HTA were appointed by Overbury on behalf of the AELTC to provide acoustic advice relating to the architectural and building services elements of the new Event Control Room, which is a critical hub for operations during The Championships. Particular attention was given to absorptive finishes within the Briefing Room, which included a baffled absorptive ceiling above the central meeting table. A variety of options were discussed with the client for the door between this space and the main operations area, with discussions undertaken to establish a balance between the desired acoustic separation and space management requirements.